Yusufeli Barajı İnşaatı 4 | Yusufeli Barajı


Selamun aleyküm dear friends. Today we will continue where we left off at Yusufeli Dam. In the previous 3 videos, I explained that the dam had risen to 100 meters from the base. As you know, as the dam rises, the concrete pouring area expands. As you know, as the dam rises, the concrete pouring area expands. However, at the same time, the thickness of the dam is reduced. Now, if we proceed step by step: In these photographs taken on 10 June 2019, the dam height exceeds 100 meters. In these photographs taken on 10 June 2019, the dam height exceeds 100 meters. And the amount of concrete used is 1.2 million cubic meters. In the following days, in these images of July 1, 2019, the dam height was 112 meters. In these images of July 1, 2019, the dam height was 112 meters. The number of ano is 17. As the dam level increases, the number of ano (every piece of dam body) increases. In these images of July 15, 2019, The height has exceeded 113 meters, but the number of ano has not changed. The height has exceeded 113 meters, but the number of ano has not changed. This may be due to the slow rise of the edge anos because of their width. This may be due to the slow rise of the edge anos because of their width. The amount of concrete used reached 1.36 million cubic meters. Days passed and 22 July 2019 was reached. The height of the dam was 115 meters and the number of ano was 18. The amount of concrete used in the body reached 1.42 million cubic meters. The amount of concrete used in the body reached 1.42 million cubic meters. While dam body construction continues, the construction of the tunnel and power plant is underway. Pipe parts produced in outside factories are brought to the building site by trucks and inserted into tunnels. pipe parts produced in outside factories are brought to the building site by trucks and inserted into tunnels. The engineers and workers who work here combine the pipe pieces by welding them together. The engineers and workers who work here combine the pipe pieces by welding them together. Anybody who thinks why they need a pipe in tunnels in a mountain; Steel pipes are used because tunnel walls cannot withstand the high pressure of water. Steel pipes are used because tunnel walls cannot withstand the high pressure of water On the other hand, in the power plant building under construction, concrete walls were first built in large galeries in the mountain. On the other hand, in the power plant building under construction, concrete walls were first built in large galeries in the mountain. then, the construction of the structures that will convert the potential energy in the incoming water into electrical energy has been started. then, the construction of the structures that will convert the potential energy in the incoming water into electrical energy has been started. Currently, the construction of the turbines and generators to be returned by the turbines is underway. Currently, the construction of the turbines and generators to be returned by the turbines is underway. As the dam construction continues, new videos will be uploaded. Thanks for watching.

6 thoughts on “Yusufeli Barajı İnşaatı 4 | Yusufeli Barajı

  1. Paylaşımlar ve bilgilendirmeler için Allah razı olsun.Kurban Bayramı herkese hayırlı olsun. .

Leave a Reply

Your email address will not be published. Required fields are marked *